Monday, February 11, 2008
more weekend work. the top pic is the ceremonial handshake that thabo and melissa performed after re-opening the door that had been part of the bathtub/shower wall. now it's a door again! second pic is busting up the old tile from the bathroom/hall (there was a layer of little pink tile under the big white ones). third one is melissa rolling a layer of paint on the tin ceiling. we put the crown molding up around the tin ceiling this weekend, too. that was a challenge.
tearing out the old bathroom
we dubbed this bathroom 'dusty rose' for its color scheme. it's been our main bathroom for the past four months or so, and it's really gross. a lot of you have seen it, so judge for yourself whether that's an exageration. anyway, saturday we tore it out to return it to its original glory as a HALLWAY TO THE BACK YARD. the good news is that the new bathroom is up and running and finished. everyone rejoiced!
Wednesday, February 6, 2008
almost done with the warsh room.
check out the grout in the first pic; cindy did that last monday while the rest of us were at work. tonight we caulked, towel rods and the vanity, installed the toilet for the final time (after an extended saga involving dan buying the same toilet twice, moving the plumbing two inches, arguing with the lowes plumbing staff, sponging toilet water out of a used toilet, trolling the internet for info about why the heck our toilet doesn't rest against the wall, and finally just putting the original toilet back in). we've got to paint some trim, clean up some caulk, do a little bit of grouting, patch a tile that is loose, and it's basically done. at which point we will all rejoice because we will not have to use the crappy bathroom that some of you have seen. we get to demolish it.
thabo on a hot tin roof...
or ceiling. thabo on a hot tin ceiling. here he is patching a spot that was left open when we extended the room and turned it into a bedroom. not bad for a first year MBA student who just landed a killer internship. not bad at all.
dan paints piece, entitled "door."
staining the door. something about staining wood is very pleasing; the way it brings out the quality of the grain.
tiling the tub.
after the bathroom floor, we tackled tiling the tub. thabo and melissa got most of it done in one day, and i finished up a bit of it the day after. the tile saw is awesome!
pocket door
one of the things we decided to do to help save space, was to install a pocket door in the bathroom. here's some pics of it partially completed. turned out to have some serious issues because our house sagged a bit in the last hundred years, and the walls/floors/ceilings aren't plumb. in some places they REALLY aren't plumb. which made for some creative construction techniques. in the end, it looks like it's going to work out great. we stained the door too; i'll post some pictures of the finished product eventually.
Saturday, January 26, 2008
grout on...
bathroom floor
last weekend we pushed through on sunday evening and got the bathroom floor tiled too. that felt good, since we realized that we need to up the progress if we're planning on trying to stick to our timeline. we used larger size tiles for the floor. had some issues lining things up, but eventually it came together pretty well.
more tilin'
here's the kitchen countertop, with the backsplash tile on (we used the nails for temporary spacers). this is kind of a unique counter/kitchen; since it's a pretty tight, galley style kitchen, we used shallow cabinets in front of the chimney (where the exposed brick is), and normal depth cabinets by the stove and sink. thanks to my mom and dad, we found a smaller size used sink for $15 at the habitat store in lancaster, pa. that goes in the hole you see in the pic.
Friday, January 25, 2008
last weekend, we tiled the kitchen countertop. bought a tile saw, tile, mortar, grout, and got to work. thabo had done this before, so he led the way. it was a lot of fun, actually, and one of those empowering moments that happens in this project, when i realize that i'm diving in to a project i've never done before, and feeling like it's going to work out. cindy did a bunch of tiling, and then she and melissa did the grouting. we're waiting on some bullnose tile for the corners to finish it up.
Tuesday, January 15, 2008
working on the duplex kitchen
here's a bunch of pics from the past weekend. putting in the new cabinets (they're not blue, that's just a protective sticker on the fronts). getting them level was a chore, since the floor is sort of bowl-shaped. we painted the pipes next to the brick, too. then came a 3/4" plywood layer for the countertop, the first layer that will hopefully end with nice looking tile. more on that as it progresses. hopefully we'll get that done this week.
2008, kitchen, ikea fiasco
the first pic is thabo pretending to read the instructions that come with the cabinets. don't be fooled. behind him is the temporary kitchen we'd set up with old cabinets. the new ones are skinnier, to allow more space in an already tight galley kitchen.
so, not to be swayed, and with a weekend ahead of us, thabo and i decided the best option would be to get out to the ikea store as early as possible, since we couldn't get anyone from ikea to answer our calls on friday night. next morning we got up early and took the FREE IKEA BUS from port authority station directly to ikea in new jersey. no kidding, they provide a free bus to and fro for cheap-minded-but-design-oriented people like us to buy their products and whisk them (and us) back to nyc.
here's thabo expressing his feelings of wonder and amazement at standing in a bus line on saturday morning in port authority (which is quite possibly one of the ugliest structures in new york). note the glazed look in his eye...
the bottom pic shows him much happier, comfortably seated on a free bus ride. ikea is directly across the freeway from newark airport, which led to a lot of conversation between us as to whether it would be possible to utilize the ikea bus as free airport shuttle of sorts.
anyway, i forgot to take pictures of ikea and the outside of the bus, so you'll just have to dream... we got the cabinets but forgot to buy the shelves that go in them. dang. thankfully, once i got ikea on the phone to discuss the wrong order, they credited us for the cabinets they sent, and told us to just keep them. so now we have three cabinets we can put somewhere else. nice ending to ikea saga.
Subscribe to:
Posts (Atom)